Testing
How often to test emergency lighting
Monthly function vs annual duration — what to check on site, what to record, and what usually fails.
BS 5266 · For contractors
Last updated 30 August 2026
Short, practical notes for UK contractors doing monthly and annual emergency lighting tests.
Testing
Monthly function vs annual duration — what to check on site, what to record, and what usually fails.
Monthly
Step-by-step flick test — test key, walk the route, what pass looks like, what not to do.
Annual
Plan the three-hour run, check mid-test, and leave the visit report and site certificate.
Paperwork
Which document is which — and when you need the visit report, the site certificate, or just the logbook.
Logbook
What each entry needs — and why monthly gaps still matter even when the annual looks fine.
Register
Stop rewriting the fitting list every visit. Carry the same register forward so the next test starts where you left off.
Software
What to look for on site — FireCert, cert apps, scheduling tools, and when paper is enough.
For the same work
Monthly flick, annual duration, living site register, and the paperwork from the visit — even with no signal.
No card · Free in open beta